Loch Longside road closed again for resurfacing

The A814 road beside Loch Long will be closed again this week because of resurfacing work.

Argyll and Bute Council say this is the second phase of work, after the road was closed between October 12 and 16.

The £70,000 scheme will see a stretch of road surface around the Finnart oil depot being removed and replaced.

Local access is maintained, but other drivers should follow a signposted diversion along the A817 Haul Road through Glen Fruin, the A82 and A83.

Be the first to comment

Leave a Reply

Your email address will not be published.


*